Footpaths and crossings are where tactile indicators do the most work and take the most punishment: rain, dust, vehicle over-run, street-cleaning machines and, in some climates, de-icing salt. This guide covers the layout rules that most standards share and the material choices that survive on the street, for engineers working on smart-city footpath programmes, road upgrades and bus corridors.
The warning field goes at the bottom of the ramp, where the footpath meets the carriageway, spanning the full width of the ramp and 600 mm deep (610 mm under ADA). Its purpose is to tell a person that the next step is into the road. On a flush or near-flush kerb the field is the only thing that marks the boundary, so it must be continuous with no gaps at the ramp wings. Where the ramp is wider than the crossing, the field still spans the ramp.
A directional run of bars leads from the line of travel along the footpath to the centre of the warning field, so that a person walking along the footpath finds the crossing rather than walking past it. The run is normally 300 mm wide and can be short, a few metres, on a narrow footpath. At signalised crossings many standards align the run with the push-button pole.
A pedestrian refuge wide enough to stand on gets a warning field at each edge. A wide median, where the person walks some distance, gets warning fields at each edge and a directional run between them so the route is not lost mid-road.
A warning field at the boarding point, usually 600 mm deep and spanning the boarding area, and a directional run from the footpath to the boarding point. Bus rapid transit platforms are treated like rail platforms with a continuous edge field.
| Situation | Recommended |
|---|---|
| Concrete or stone footpath, inland city | Stainless steel SS 304 studs or tiles, stem-fixed in epoxy |
| Coastal city, or roads treated with de-icing salt | Stainless steel SS 316 |
| New paving-tile footpath | Porcelain tactile tiles laid with the paving |
| Covered bus shelters, subways, metro entrances | PU studs and tiles for colour contrast at lower cost |
| Heritage stone in a city centre | Loose stainless steel or brass studs to limit cutting |
Self-adhesive fixing is not recommended on open pavements; use stem-fixed studs or screw-and-adhesive tiles.
Grey concrete against satin stainless steel often fails a contrast check. Use yellow poly inserts, black carborundum inserts or PVD black on stainless steel, or yellow porcelain tiles. Read the luminance contrast guide before finalising.
For a 2 m-wide kerb ramp on each side of the road: two fields of 2 m × 0.6 m, so about 960 studs or 28 tiles, plus around 3 m of directional run each side (40 bars each). A refuge adds two more fields. MetalX will prepare a bill of quantities from the junction drawings for a programme of crossings, and holds standard studs, tiles and bars in stock for phased release.
At the bottom of the ramp where the footpath meets the road, spanning the full ramp width and 600 mm deep (610 mm under ADA), with no gaps at the ramp wings.
Stainless steel studs or tiles fixed in epoxy, SS 316 in coastal cities or where de-icing salt is used. Porcelain tactile tiles suit new paving-tile footpaths.
Not on open pavements. Rain, dust, freeze-thaw and sweepers call for stem-fixed studs or screw-fixed tiles.
About 480 studs or 14 tiles per 2 m kerb ramp, so roughly 960 studs or 28 tiles for both sides, plus directional bars leading to each field.

Grade selection, surface patterns, fixing methods and the dimensional requirements of the major standards, in one guide for specifiers.
20 March 2026 · 6 min read
Platform edges, escalator landings and concourses: how integrated stainless steel tiles are laid out, installed in short possessions and specified for transport hubs.
25 March 2026 · 6 min read
The two tactile messages, where each belongs in a building or street, and the layout rules that make them readable to cane and foot.
27 March 2026 · 5 min readSend us your drawings, quantities and delivery location. We reply with a quotation, technical datasheet and lead time, usually within one working day.