Counting tactile indicators from a plan is quick once you know four numbers. This article gives the numbers, the method and three worked examples, using the MetalX standard geometry: studs at 50 mm centres, bars at 75 mm centres, 300 × 300 mm tiles.
| Element | Rule | Source |
|---|---|---|
| Studs per square metre of field | 400 | 50 mm grid: 20 × 20 |
| Studs per running metre of 600 mm-deep field | 240 | 12 rows × 20 per metre |
| Tiles per running metre of 600 mm-deep field | 6.7 | 2 rows ÷ 0.3 m |
| Bars per metre of 300 mm-wide path | 13.3 | 4 across × (1 ÷ 0.3 m) |
For a 600 mm-wide path double the bars (26.7 per metre). For bar tiles on a 300 mm path use 3.3 per metre. A warning square at a junction is usually the path width squared or 600 × 600 mm: 144 studs or 4 tiles.
Stair 1.8 m wide, three flights, floors connected by long landings. Fields at the head and foot of each flight: 6 fields × 1.8 m × 240 = 2,592 studs, or 6 × 12 = 72 tiles. Add 2%: 2,650 studs or 74 tiles. Order 3,000 studs (three cartons) or 80 tiles. See laying out tactile indicators on stairs for the setback rules.
Two side platforms 140 m long. Edge fields: 2 × 140 × 6.7 = 1,876 tiles. Four escalator and stair landings 2.4 m wide top and bottom: 8 × 16 = 128 tiles. Two lifts per platform: 4 squares × 4 = 16 tiles. Total 2,020 tiles; add 2% and round: 2,070 tiles. Guiding paths from the two entrances through the concourse, 180 m total: 180 × 13.3 = 2,394 bars, plus 12 junction squares × 144 = 1,728 loose studs. Order 2,500 bars and 2,000 studs.
Guiding path 120 m from reception along the corridor with 8 department entrances and 3 junctions. Path: 120 × 13.3 = 1,596 PU bars. Squares: 11 × 144 = 1,584 PU studs. Two stair sets 1.5 m wide: 4 fields × 1.5 × 240 = 1,440 studs. Total: 1,600 bars and 3,024 studs; add 2% and round to 1,700 bars and 3,500 studs.
Send MetalX the plan and we will return a bill of quantities by product and material, with a quotation, usually within two working days.
400 at 50 mm centres, which is 36 per 300 × 300 mm. A 600 mm-deep warning field needs 240 studs per running metre.
About 6.7 tiles for a 600 mm-deep field (two rows of 300 mm tiles). Add 2% for cutting.
About 13.3 for a 300 mm-wide path (four bars across at 75 mm centres), or 26.7 for a 600 mm path. Add a warning square at every turn, junction and destination.
2% for stainless steel, brass, aluminium and PU; 3–5% for porcelain tiles. Keep 1–2% as spares for the facilities team.

Tiles install five times faster and guarantee alignment; studs handle curves and heritage floors. A clear rule for choosing between the two formats.
12 February 2026 · 6 min read
Strips are individual bars for guiding paths that follow any route; tiles are one-piece plates for fast, uniform warning fields. Which format fits your layout?
8 March 2026 · 5 min read
Ten questions to ask a polyurethane tactile manufacturer before you order, from compound data and dimensional tolerances to templates, stock and export paperwork.
12 March 2026 · 5 min readSend us your drawings, quantities and delivery location. We reply with a quotation, technical datasheet and lead time, usually within one working day.